A hybrid inverter is a solar inverter that converts DC power from the solar panels into AC, charges and discharges a lithium battery through the same unit, and can supply a backup (EPS) output when the grid fails. To choose the right model, first pin down the battery voltage (LV 48 V or HV), whether the site is single-phase or three-phase, the number of MPPTs and the voltage range that suit the PV array, the load power to be backed up, and BMS communication with the battery.
In this article, we explain what installers and EPC companies check when choosing a hybrid inverter and illustrate each point with real technical data from the Solis S6 and Jebel series.
Hybrid inverter vs. on-grid inverter
An on-grid (grid-tied) inverter only converts PV power into AC synchronised with the grid; it has no battery connection and shuts down when the grid fails because of anti-islanding protection. A hybrid inverter, by contrast, has a battery port, a grid port and a separate backup output. During the day, surplus solar energy first charges the battery and the rest goes to the loads or the grid; in the evening, the battery supplies the loads.
In practice, the difference is this: an on-grid system lowers energy costs, while a hybrid system also raises self-consumption and keeps critical loads running during an outage. On a roof where the only goal is a lower bill and outages are not a problem, an on-grid inverter may be enough; on a site with high evening consumption or a weak grid, a hybrid inverter is the better choice.
Battery voltage: LV (48 V) or HV?
Hybrid inverters fall into two groups. Low-voltage (LV) models work with 48 V class batteries; for example, the Solis S6 5kW Single-Phase LV Hybrid Inverter has a battery voltage range of 40–60 V and delivers up to 112 A charge/discharge current in the 5K model. High-voltage (HV) models work at several hundred volts with battery modules connected in series: the Solis S6 20kW Three-Phase HV Hybrid Inverter accepts a 120–800 V battery range and the Jebel 20kW Three-Phase HV Hybrid Inverter 150–750 V, and both work with a maximum battery current of 50 A.
The difference comes from basic electrics: power is voltage times current (P = U × I). A battery power of 10 kW needs about 195 A at 51.2 V, but the same power flows at 400 V with about 25 A. Lower current means thinner battery cables, less heat and lower losses. That is why HV is more common in residential and small commercial projects above 10–12 kW, while LV is practical and flexible in small residential systems and in projects that reuse existing 48 V batteries.
| Model | Phase | Battery voltage range | Max. battery current |
|---|---|---|---|
| Solis S6 5kW LV | Single-phase | 40–60 V | 112 A |
| Jebel 8kW LV | Single-phase | 40–60 V | 180 A |
| Solis S6 10kW LV | Three-phase | 40–60 V | 220 A |
| Solis S6 20kW HV | Three-phase | 120–800 V | 50 A |
| Jebel 20kW HV | Three-phase | 150–750 V | 50 A |
The battery's own operating voltage range must lie entirely within the inverter's battery voltage window. In HV systems, this sets the minimum and maximum number of modules in the stack.
Single-phase or three-phase?
The AC side of the inverter must match the site's grid connection. A single-phase connection takes a single-phase hybrid inverter (L/N/PE, 220/230 V); a three-phase connection takes a three-phase hybrid inverter (3/N/PE, 380/400 V). If a 48 V battery is preferred on a three-phase site, three-phase LV models such as the Solis S6 10kW Three-Phase LV Hybrid Inverter combine both needs.
The issue to watch in three-phase systems is phase imbalance. In homes, loads are rarely spread evenly across the phases; in backup mode, one phase can carry far more load than the others. The Solis S6 20kW HV can deliver unbalanced output of up to 40% of its rated power per phase, while the Jebel 20kW HV offers 100% unbalanced three-phase load output and integrated zero export. If large single-phase loads need backup, always check this value.
Number of MPPTs and PV input voltage
The number of MPPTs (maximum power point trackers) lets you run roof surfaces with different orientations or tilts independently of each other. The Solis S6 5kW LV has 2 MPPTs, a maximum input voltage of 500 V and an MPPT range of 90–435 V; it accepts PV input of up to 160% of its rated power. The Solis S6 20kW HV has 4 MPPTs and 20 A input current per MPPT; the Jebel 20kW HV offers a maximum PV voltage of 1000 V, an MPPT range of 180–850 V and 2 MPPTs with 30 A per MPPT.
Two rules always apply to string design. First, the open-circuit voltage (Voc) of the string at the lowest cell temperature on site must stay below the inverter's maximum input voltage; panel voltage rises in the cold. Second, the operating voltage (Vmp) of the string on the hottest day must stay within the MPPT range. In addition, the solar panel current must not exceed the current allowed per MPPT; with large high-current panels, this limit is often the deciding factor.
Backup power (EPS) and switchover time
How much load runs during an outage depends on the rated power of the backup output and the power the battery can deliver. In the Solis and Jebel hybrid models we reviewed, switchover to backup power takes less than 10 ms, which most sensitive devices such as computers and modems usually do not notice. For the inrush current of motor loads, check the short-term overload capacity: the backup output of the Solis S6 5kW LV can deliver 2 times its rated power for 10 seconds.
During installation, group the loads to be backed up in a separate critical-load panel and size the backup output to that panel's simultaneous consumption. If outages last long, a model with a generator input makes the job easier; Jebel hybrid inverters have a separate GEN port for diesel generators.
Battery compatibility and BMS communication
Reliable operation of a lithium battery with a hybrid inverter depends on communication between the battery's BMS and the inverter. The BMS shares the charge current limit, state of charge (SOC) and alarms with the inverter. In the Solis hybrid models we reviewed, battery communication runs over CAN / RS485; in Jebel hybrid models, the Li-ion battery charging strategy adapts automatically to the BMS. LV models also support lead-acid batteries, but in new projects a LiFePO4 lithium battery offers a longer cycle life and higher usable capacity.
Before commissioning, check that the chosen battery is on the inverter manufacturer's compatibility list and that the communication protocol and cable pin-out match. You can find suitable batteries in the Solar Storage category.
Hybrid inverter selection checklist
- Grid connection: single-phase or three-phase, and what is the contracted power?
- Battery architecture: LV (48 V) or HV; does the battery voltage range fit the inverter's window?
- Evening and night consumption: required usable battery capacity (kWh) and charge/discharge power (kW).
- PV string: number of MPPTs, Voc check in the cold and Vmp check in the heat, current per MPPT.
- Backup output: total power of critical loads, inrush currents, phase imbalance.
- Need for a generator and zero-export requirement.
- Battery BMS communication (CAN / RS485) and compatibility list.
- Installation location: IP rating, ambient temperature, ventilation.
Frequently Asked Questions
Does a hybrid inverter work without a battery?
Many hybrid inverters can run in on-grid mode without a battery, and a battery can be added later. Backup power during an outage does need a battery, though; confirm the model's support for operation without a battery in its technical documentation.
Should I choose a 48 V hybrid inverter or a high-voltage one?
LV is practical in small residential systems and in projects that reuse existing 48 V batteries. At higher power, HV allows thinner cables and lower losses thanks to its lower current.
Can a single-phase hybrid inverter be used in a three-phase home?
Technically yes, but generation and backup stay tied to one phase. For balanced loads and backup, choose a three-phase hybrid inverter on a three-phase site, and check the grid operator's rules as well.
Is the whole house backed up during an outage?
Only the loads connected to the backup output are supplied. Because the backup output power and battery capacity are limited, grouping critical loads in a separate panel is the safest approach.
To size the right hybrid inverter and lithium battery for your project together, request a quote.